Mezuzah in the Warehouse - Placement of the Mezuzah
This question and answer were automatically translated using our trained AI and have not yet been reviewed by a qualified rabbi. Please treat this translation with caution.
go to original →
Question
Regarding the placement of a mezuzah in a warehouse in the yard: the warehouse door is integral - it fits entirely into the wall, and it is as thick as the wall. There is no doorpost, only hinges. Where exactly should the mezuzah be placed? If on the wall: (adjacent to the door) - the exterior or the interior? - (inside the warehouse)? And also, on the right side - when entering from outside, or on the right side - when standing inside the warehouse and exiting? Thank you.
Answer
Shalom and blessings
The mezuzah should be placed on the wall to the right of the entrance.
The mezuzah is affixed on the right side of one entering from the house into the room.
Comments

- Top halachic Q&A
- Practical festival halachot